Vaca Muerta · Neuquén · AR

Energy-native
AI infrastructure.

Power generated at the source. Converted on site into compute.

120–200 MW

Platform capacity

PUE ~1.10

Efficiency target

BESS-ready

Grid-independent

30 MW

First block

// Energy Stack

The full stack,
owned end-to-end.

We design, build, and operate every layer — from wellhead to workload. No third parties. No dependencies.

Gas that would otherwise be flared at the wellhead — plus Patagonia's wind and solar — become the continuous fuel of the entire stack. Zero energy wasted.

~40 MW

per wellhead site

97.5%

capture uptime

15–60 PSI

gas pressure range

Every layer owned. Every layer monitored. Zero grid dependency.

Full stack — 5 integrated layers

// Deployment Roadmap

Three phases.
Progressive validation.

Three phases across Vaca Muerta — from a first site to a full-scale AI infrastructure hub.

Click on each phase above to explore details

Phase 1 / 3
Phase 012026 H2 → 2027 H1

Pilot — Infrastructure Validation

The first site operates on captured flared gas from a wellhead in Vaca Muerta. On-site generation powers compute workloads directly — no grid, no intermediaries. This phase establishes the energy contract, site operations, and the infrastructure model that scales forward.

Energy mix

100% flared gas · no grid

Phase 1 of 3

Key milestones

01

Site & energy secured

Site agreement, initial permits, energy contract signed

02

Engineering & EPC

Final engineering, detail design, procurement and pilot construction

03

Compute deployment

ASIC procurement, container installation, commissioning

04

Operations live

Staffing, 10 MW commissioned, 24/7 operation begins

05

AI/HPC preparation

AI strategy, thermal design study, connectivity assessment

// Business Model

We sell power-backed
compute capacity.

Select your profile to explore how PATAGONai creates value for each stakeholder.

Reserve AI/HPC capacity before full deployment. Lock in power-backed compute at pre-operational rates.

Q3 2027

first capacity online

Pre-operational pricing

Power-backed SLA

Dedicated GPU pods

Low PUE design

AI / HPC

Compute Buyers

Q3 2027

first capacity online

Reserve AI/HPC capacity before full deployment. Lock in power-backed compute at pre-operational rates.

What you get

Pre-operational pricing

Power-backed SLA

Dedicated GPU pods

Low PUE design

// Get in touch

Join the race to
energy-native AI.

Let's build the infrastructure that powers the intelligence economy.

For compute buyers

Reserve Capacity

Secure AI/HPC compute before full deployment. Lock in pre-operational rates.

For gas operators

Partner on Gas

Monetize flared gas and stranded energy assets. We handle the full infrastructure stack.

For investors

Investor Inquiry

Access the investment brief and phased deployment roadmap.

PATAGONai ENERGY

© 2025 PATAGONai Energy. All rights reserved.

Powered by RTS Group